Project Overview
Project Name: ESP Power Connection Phase III Project
Location: Iraq
Scope: Supply of 66kV glass insulators and hardware fittings
Delivery Time: 2020
Supplier: UNI Electric Group Co., Ltd
Project Background
The ESP Power Connection Phase III Project in Iraq was a critical infrastructure initiative aimed at strengthening the country’s power transmission network. As part of this project, high-quality 66kV glass insulators and hardware fittings were required to ensure reliable and efficient electricity distribution. UNI Electric Group Co., Ltd was selected to design, manufacture, and supply the essential components for both 120kN tension insulator strings and 70kN suspension insulator strings, meeting the stringent technical and environmental demands of the region.
Challenges & Solutions
1. Harsh Environmental Conditions
Iraq’s extreme temperatures, dust storms, and high humidity posed challenges for transmission line durability. UNI Electric provided tempered glass insulators with excellent pollution resistance and self-cleaning properties, ensuring long-term performance under harsh conditions.
2. High Mechanical Strength Requirements
The project required robust insulator strings capable of withstanding mechanical stresses. UNI Electric supplied:
120kN tension insulator strings – Designed for high mechanical load-bearing capacity in critical tension applications.
70kN suspension insulator strings – Optimized for reliable performance in suspension setups.
3. Timely Delivery & Logistics
Despite global supply chain challenges in 2020, UNI Electric ensured on-time delivery by optimizing production schedules and logistics, supporting the project’s progress without delays.
Key Contributions by UNI Electric Group
✔ Customized Design: Tailored insulator solutions to meet Iraq’s grid specifications.
✔ High-Quality Materials: Used high-grade glass and corrosion-resistant hardware for longevity.
✔ Rigorous Testing: Ensured compliance with international standards (IEC, ANSI).
✔ Efficient Project Execution: Delivered on schedule, supporting Iraq’s power infrastructure development.
Project Outcome
The successful deployment of UNI Electric’s 66kV insulators contributed to a more stable and efficient power transmission network in Iraq. The project demonstrated UNI Electric’s expertise in delivering high-performance electrical solutions for demanding environments.
Conclusion
The ESP Power Connection Phase III Project highlights UNI Electric Group’s capability to provide reliable, high-strength insulator solutions for critical transmission infrastructure. By combining advanced engineering, quality manufacturing, and efficient logistics, UNI Electric supported Iraq’s energy sector development, reinforcing its reputation as a trusted global supplier in the power industry.